View single post by Larry G
 Posted: Tue Aug 2nd, 2016 08:28 pm
PMQuoteReplyFull Topic
Larry G



Joined: Wed Jun 15th, 2016
Location: Rapid City, South Dakota USA
Posts: 882
Status: 
Offline
I made a little progress around the new bridge area. Before the bridge goes in, scenery behind the bridge and the dry wash need to be finished. Trying to do this after the bridge is installed would be a pain in the butt.

Attachment: DSC00275.jpg (Downloaded 147 times)

Close Window