Freerails Home 
Home Search search Menu menu Not logged in - Login | Register
Freerails > Model Railroad Forums > Track Planning > Mountain 'Big Boy' Track ... Gauge-1

Freerails IS ACCEPTING new Members ... To join Freerails ... See how to Register as a Member in the 'Joining Freerails' Forum

Mountain 'Big Boy' Track ... Gauge-1
 Moderated by: . Page:  First Page Previous Page  ...  4  5  6  7  8  9  10  Next Page Last Page  
New Topic Reply Printer Friendly
 Rating:  Rating
AuthorPost
 Posted: Sun Oct 11th, 2020 02:55 pm
  PMQuoteReply
81st Post
Steve P
Registered


Joined: Fri Apr 20th, 2018
Location: Colorado USA
Posts: 179
Status: 
Offline
 
Finished removing all slash, short logs and flush-cut stumps to county sort yard. 

Pic on left is from end of trestle looking towards SF. 
Sacramento is just beyond the long log, and will be reached with a tunnel,
underneath the logging path running beside the log. 
SF is the area of brown grass in the distance. 

Pic on the right is from LA looking towards SF. 
Again SF is the area of brown grass in the distance. 

Switching to firewood, need to cut 8 cords before winter sets in. 
If snow hasn't shut me down by the time I've finished,
I will start to skid all those logs to piles at the bottom of the SF hill. 
My wood lot is overflowing at this point,
so they will have to chill on the hillside for a few years.







____________________
Steve
Beaver Lode Railway
https://evvette.net/trains/
Back To Top

 Posted: Sun Oct 11th, 2020 11:56 pm
  PMQuoteReply
82nd Post
Steve P
Registered


Joined: Fri Apr 20th, 2018
Location: Colorado USA
Posts: 179
Status: 
Offline
 

I did a quick measurement of rough track distances for the whole layout:


Done:

  Omaha depot:                                                40'
  Omaha yards:                                                96'
       

To do:

  Omaha tunnels thru Ogden to Lucin trestle:     125'
  Lucin trestle:                                                  52'
  Trestle to Sacramento:                                    44'
  Sacramento to Emeryville:                              112'
  Emeryville to San Hose:                                  96'
  San Hose thru San Francisco:                          60'
  San Hose thru Los Angeles:                            100'


Total:                                                              725'




____________________
Steve
Beaver Lode Railway
https://evvette.net/trains/
Back To Top

 Posted: Mon Oct 12th, 2020 12:51 am
  PMQuoteReply
83rd Post
Ken C
Registered


Joined: Tue Jun 16th, 2015
Location:  Calgary, Alberta Canada
Posts: 1053
Status: 
Offline
 
Steve

Above and beyond the typical concept of layout construction.

Following your progress with interest.




____________________
Ken Clark
GWN

Kaslo & Slocan Railway
International Navigation & Trading Co
Kootenay Railway & Navigation Co.
Back To Top

 Posted: Mon Oct 12th, 2020 11:00 pm
  PMQuoteReply
84th Post
Steve P
Registered


Joined: Fri Apr 20th, 2018
Location: Colorado USA
Posts: 179
Status: 
Offline
 
Ken, 

That's just mainline distance, not depot/yard track. 

I *think* my strategy will be to run past all the yards,
heading for LA in as direct a path as possible. 

This will allow me to run a consist the whole distance in about 2-3 years.
Then I build out depots later. 

That would be approx. 560' @  $8.00 a foot (includes concrete) = $4480.
A lot, but do-able, especially spread out over 3 years.



This is a pic. of the San Francisco depot area taken from Omaha. 
LA and San Hose are to the left and Emeryville and Sacramento are to the right.
 
I'm hoping some judicious tree cutting will give a view of both LA and Sacramento from Omaha
(which is located on the patio directly in front of the house's sunroom).







____________________
Steve
Beaver Lode Railway
https://evvette.net/trains/
Back To Top

 Posted: Fri Oct 23rd, 2020 03:11 pm
  PMQuoteReply
85th Post
Steve P
Registered


Joined: Fri Apr 20th, 2018
Location: Colorado USA
Posts: 179
Status: 
Offline
 
All the logs have been cleared from the SP right-of-way. 

Pic. on the left is looking from Sacramento towards LA. 
Pic. on the right is looking from LA to Sacramento.
 
They're predicting a foot of snow on Sunday,
guess it's time to end my outdoor RR activities for the year. 

I've had a very productive season.  :2t:







____________________
Steve
Beaver Lode Railway
https://evvette.net/trains/
Back To Top

 Posted: Mon Oct 26th, 2020 02:04 pm
  PMQuoteReply
86th Post
Steve P
Registered


Joined: Fri Apr 20th, 2018
Location: Colorado USA
Posts: 179
Status: 
Offline
 
7:00am, -4F.  About 10" of snow. 
Picture taken from INSIDE sun room. 

Looking towards SF,
that horizontal hump in the foreground is the Omaha mainline.
 
We really needed this snow,
I have fires on 3 sides of me at this point... 

Steve







____________________
Steve
Beaver Lode Railway
https://evvette.net/trains/
Back To Top

 Posted: Fri Dec 4th, 2020 12:42 am
  PMQuoteReply
87th Post
Si.
Moderator


Joined: Thu Feb 23rd, 2012
Location: London
Posts: 5906
Status: 
Offline
 
Hi Steve  :wave:


I hope you're doing OK there in snowy Colorado ?  L:

Looks like I might have a modest 'dusting' today myself !  :w:

Nice work on keeping your local :moose: out !


:java: :cool:


Si.




____________________

' Mysterious Moose Mountain ' - 1:35n2 - pt.II
http://www.freerails.com/view_topic.php?id=7318&forum_id=17&page=1

' M:R:W Motor Speedway !!! ' - 1:32 Slotcar Racing Layout
http://www.slotforum.com/forums/index.php?showtopic=59295&st=0&a
Back To Top

 Posted: Fri Dec 4th, 2020 12:50 am
  PMQuoteReply
88th Post
Steve P
Registered


Joined: Fri Apr 20th, 2018
Location: Colorado USA
Posts: 179
Status: 
Offline
 
Si, 

They want in REAL bad.

That's a 5 foot tall fence for reference : 







____________________
Steve
Beaver Lode Railway
https://evvette.net/trains/
Back To Top

 Posted: Wed Dec 9th, 2020 06:41 am
  PMQuoteReply
89th Post
Traingeekboy
Registered


Joined: Sun Aug 28th, 2011
Location:  
Posts: 516
Status: 
Offline
 
I forgot how big squirrels get up your way.  ;)






____________________
Did I ever mention that I like trains?
Back To Top

 Posted: Wed Dec 9th, 2020 04:21 pm
  PMQuoteReply
90th Post
Steve P
Registered


Joined: Fri Apr 20th, 2018
Location: Colorado USA
Posts: 179
Status: 
Offline
 
Train, 

Those 2 behind her are calves from this past Spring. 
Young "squirrels" have to grow real fast to be ready for the winters around here! 

They will follow her around till next Spring,
then she will "kick them out of the nest" when she gives birth again. 

Steve




____________________
Steve
Beaver Lode Railway
https://evvette.net/trains/
Back To Top


 Current time is 01:02 pm
Page:  First Page Previous Page  ...  4  5  6  7  8  9  10  Next Page Last Page  

Freerails > Model Railroad Forums > Track Planning > Mountain 'Big Boy' Track ... Gauge-1
Top



UltraBB 1.172 Copyright © 2007-2016 Data 1 Systems