Freerails Home 
Home Search search Menu menu Not logged in - Login | Register
Freerails > Model Railroad Forums > Large Scale > 'Geneseo Railway' - Gn15

Freerails IS ACCEPTING new Members ... To join Freerails ... See how to Register as a Member in the 'Joining Freerails' Forum

'Geneseo Railway' - Gn15
 Moderated by: . Page:    1  2  3  4  5  6  ...  Next Page Last Page  
New Topic Reply Printer Friendly
 Rating:  Rating
AuthorPost
 Posted: Mon Mar 7th, 2016 09:58 pm
  PMQuoteReply
1st Post
Bob R
Registered


Joined: Thu Nov 20th, 2014
Location: Springfield , Nebraska USA
Posts: 638
Status: 
Offline
Began a 1/24th scale switching layout in Jan 2015. Contemplating posting the build in this forum. First need to see if I can figure out the picture posting technique.

http://freerails.com/gallery/5776/thumbs/5776_071732_400000000.jpg



____________________
Bob
Back To Top

 Posted: Sun Apr 3rd, 2016 04:47 am
  PMQuoteReply
2nd Post
Bob R
Registered


Joined: Thu Nov 20th, 2014
Location: Springfield , Nebraska USA
Posts: 638
Status: 
Offline
Another attempt at picture posting.

Attachment: 036.jpg (Downloaded 866 times)



____________________
Bob
Back To Top

 Posted: Sun Apr 3rd, 2016 05:05 am
  PMQuoteReply
3rd Post
Bob R
Registered


Joined: Thu Nov 20th, 2014
Location: Springfield , Nebraska USA
Posts: 638
Status: 
Offline
Alright now back to the beginning.....

It is May 1949 in the rural community of Geneseo. The long economic drought caused by the Great Depression and followed by World War II has finally come to an end. Still the effects are being felt and show in the ravaged condition of buildings an equipment.

The town is served by a light industrial 18" narrow gauge railway developed to serve local industries. It once connected to the outside world through its interchange with a mainline standard gauge railroad. But now improved roadways and modern trucks have rendered that unnecessary.

The railways 4 miles of rail still operate providing for movement of goods to the small businesses in the community. The equipment is aged and in poor condition. There is not enough revenue to justify anything more than essential repairs. Certainly, no consideration of replacement. Abandonment is a real possibility in the foreseeable future.

Attachment: 003.JPG (Downloaded 863 times)

Last edited on Wed Dec 7th, 2016 04:12 am by Bob R



____________________
Bob
Back To Top

 Posted: Mon Apr 4th, 2016 05:18 am
  PMQuoteReply
4th Post
Bob R
Registered


Joined: Thu Nov 20th, 2014
Location: Springfield , Nebraska USA
Posts: 638
Status: 
Offline
A little about Geneseo Railway. For the past few years I have been building small Gn15 display layouts. In January of 2015 I decided the furnace room was big enough to build a small switching layout. After removing all the items stored there I sheetrocked the walls, added a dropped ceiling and built shelf style benchwork along two walls. The area is L shaped 13 ft on each wall and 2 ft deep. Each side has a switching (industrial) area with a run around track and a few sidings. This provides a lot of operation for two operators. Movements from one side to the other require coordination as there is a single track connecting the sides of the L.

I liked the extreme narrow gauge engines and rolling stock I had been building in Gn15 so decided the layout would be 1/24th scale approximately 18" gauge using HO scale mechanisms and wheel sets. That is what led me to the small industrial type gas mechanical critters. I had just begun experimenting with battery power radio control and decided to make the layout dead rail. I have used DelTang radio receivers and transmitters. The four critters are all powered by Bachmann GE44 ton power trucks using a single lipo cell with a Pololu step up voltage regulator. Coupling is by three link chains which are also handled manually.

Track work is all hand laid code 83 rail with stub turnouts. I used Caboose Hobbies ground throws and everything is manually operated.

Attachment: IMG_0470.JPG (Downloaded 856 times)



____________________
Bob
Back To Top

 Posted: Mon Apr 4th, 2016 06:02 am
  PMQuoteReply
5th Post
mwiz64
Registered


Joined: Mon Mar 26th, 2012
Location: Fenton, Michigan USA
Posts: 1330
Status: 
Offline
Very nice, Bob. I'd love to see more...



____________________
Mike
Back To Top

 Posted: Mon Apr 4th, 2016 08:23 pm
  PMQuoteReply
6th Post
W C Greene
Moderator


Joined: Fri May 4th, 2007
Location: Royse City, Texas USA
Posts: 8253
Status: 
Offline
Very cool...Handlaid track & radio control? Gotta be something in the air! Keep on building & photographing, we love it.

Woodie



____________________
It doesn't matter if you win or lose, its' how you rig the game.
Back To Top

 Posted: Mon Apr 4th, 2016 10:17 pm
  PMQuoteReply
7th Post
Bob R
Registered


Joined: Thu Nov 20th, 2014
Location: Springfield , Nebraska USA
Posts: 638
Status: 
Offline
Thanks for encouragement...

The next step was to add turntables at each end. Sticking with the manual operations theme I made the turntables fro CDs and CD cases.

Attachment: IMG_0338.JPG (Downloaded 840 times)



____________________
Bob
Back To Top

 Posted: Mon Apr 4th, 2016 10:20 pm
  PMQuoteReply
8th Post
Bob R
Registered


Joined: Thu Nov 20th, 2014
Location: Springfield , Nebraska USA
Posts: 638
Status: 
Offline
Then a bit of ballast and color to the track work. Over the past couple winters I swept up the sand, gravel and dirt deposited on the garage floor after snow storms. The texture is not bad and it is free!

Attachment: IMG_0356.JPG (Downloaded 843 times)



____________________
Bob
Back To Top

 Posted: Wed Apr 6th, 2016 05:31 am
  PMQuoteReply
9th Post
Bob R
Registered


Joined: Thu Nov 20th, 2014
Location: Springfield , Nebraska USA
Posts: 638
Status: 
Offline
Considering the deteriorated condition of the equipment it was a necessity to have a small engine repair shed. The shed also reflects the thrifty approach to the railway. I do intend to outfit it with a work bench and some tools.

Attachment: IMG_0369.JPG (Downloaded 318 times)

Last edited on Wed Apr 6th, 2016 05:33 am by Bob R



____________________
Bob
Back To Top

 Posted: Wed Apr 6th, 2016 05:34 am
  PMQuoteReply
10th Post
Bob R
Registered


Joined: Thu Nov 20th, 2014
Location: Springfield , Nebraska USA
Posts: 638
Status: 
Offline
The engine shed has been in place for a little while now and the vines are beginning to overtake it.

Attachment: IMG_0408.JPG (Downloaded 317 times)



____________________
Bob
Back To Top


 Current time is 12:35 pm
Page:    1  2  3  4  5  6  ...  Next Page Last Page  

Freerails > Model Railroad Forums > Large Scale > 'Geneseo Railway' - Gn15
Top



UltraBB 1.172 Copyright © 2007-2016 Data 1 Systems