Freerails Home 
Home Search search Menu menu Not logged in - Login | Register
Freerails > Model Railroad Forums > Large Scale > 'Geneseo Railway' - Gn15

Freerails IS ACCEPTING new Members ... To join Freerails ... See how to Register as a Member in the 'Joining Freerails' Forum

'Geneseo Railway' - Gn15
 Moderated by: . Page:  First Page Previous Page  ...  4  5  6  7  8  9  10  11  12  13  14  ...  Next Page Last Page  
New Topic Reply Printer Friendly
 Rating:  Rating
AuthorPost
 Posted: Tue May 3rd, 2016 10:13 am
  PMQuoteReply
81st Post
NevadaBlue
Registered


Joined: Mon Apr 7th, 2014
Location: Under The Blue Nevada Sky, Nevada USA
Posts: 695
Status: 
Offline
I need to try that background technique with one of Duane's photos. I should take a copy to the print shop next week when we are 'out'.



____________________
Ken

Back To Top

 Posted: Wed May 4th, 2016 03:34 am
  PMQuoteReply
82nd Post
Bob R
Registered


Joined: Thu Nov 20th, 2014
Location: Springfield , Nebraska USA
Posts: 610
Status: 
Offline
Finished the first of many planned trees.

Attachment: 20160503_164221_resized.jpg (Downloaded 227 times)



____________________
Bob
Back To Top

 Posted: Thu May 5th, 2016 08:24 pm
  PMQuoteReply
83rd Post
Bob R
Registered


Joined: Thu Nov 20th, 2014
Location: Springfield , Nebraska USA
Posts: 610
Status: 
Offline
Made two more trees yesterday and planted them today. They are a little over a foot tall.

Attachment: 20160505_093131_resized.jpg (Downloaded 208 times)



____________________
Bob
Back To Top

 Posted: Fri May 6th, 2016 11:06 am
  PMQuoteReply
84th Post
NevadaBlue
Registered


Joined: Mon Apr 7th, 2014
Location: Under The Blue Nevada Sky, Nevada USA
Posts: 695
Status: 
Offline
:moose:



____________________
Ken

Back To Top

 Posted: Mon May 9th, 2016 06:11 am
  PMQuoteReply
85th Post
Bob R
Registered


Joined: Thu Nov 20th, 2014
Location: Springfield , Nebraska USA
Posts: 610
Status: 
Offline
Today I made a couple trash cans and some empty bottles to clutter the "back alley" of the latest building. Clutter sure takes time.

The trash cans are made from the caps off pump hairspray bottles. I wrapped them with the corrugated coffee cup insulaters. Then added paper strips around top and bottom edges. Lid was also made with paper.

Bottles are made from the clear plastic sprues from a model car kit.

Bob

Attachment: 20160508_151522_resized.jpg (Downloaded 169 times)



____________________
Bob
Back To Top

 Posted: Mon May 9th, 2016 07:35 am
  PMQuoteReply
86th Post
NevadaBlue
Registered


Joined: Mon Apr 7th, 2014
Location: Under The Blue Nevada Sky, Nevada USA
Posts: 695
Status: 
Offline
You do neat stuff.

I too like the coffee cup insulators. Handy...



____________________
Ken

Back To Top

 Posted: Tue May 10th, 2016 10:49 pm
  PMQuoteReply
87th Post
Bob R
Registered


Joined: Thu Nov 20th, 2014
Location: Springfield , Nebraska USA
Posts: 610
Status: 
Offline
Tried another type tree. This time a spindly evergreen of sorts. Kind of happy with the result for this first one. Will have to add a few more.

Bob

Attachment: 20160510_122549_resized.jpg (Downloaded 152 times)

Last edited on Tue May 10th, 2016 10:49 pm by Bob R



____________________
Bob
Back To Top

 Posted: Tue May 10th, 2016 11:44 pm
  PMQuoteReply
88th Post
W C Greene
Moderator


Joined: Fri May 4th, 2007
Location: Royse City, Texas USA
Posts: 8281
Status: 
Offline
Howdy Bob...make me some too! Maybe just 20 or 30 or so!!! Excellent looking conifer.

Woodie



____________________
It doesn't matter if you win or lose, its' how you rig the game.
Back To Top

 Posted: Wed May 11th, 2016 12:35 am
  PMQuoteReply
89th Post
Bob R
Registered


Joined: Thu Nov 20th, 2014
Location: Springfield , Nebraska USA
Posts: 610
Status: 
Offline
Thanks Woodie... Took about 3 hours to build. Let's see that would be 60-90 hours. In our scales there are not many vendors selling trees. Really a simple build, just time consuming.

Bob

Attachment: 20160510_122617_resized.jpg (Downloaded 146 times)



____________________
Bob
Back To Top

 Posted: Wed May 11th, 2016 08:03 pm
  PMQuoteReply
90th Post
Bob R
Registered


Joined: Thu Nov 20th, 2014
Location: Springfield , Nebraska USA
Posts: 610
Status: 
Offline
In addition to the construction of the many differing parts of Geneseo Railway I have been operating it daily. I am using a car card system with the various industries/businesses on each car card. I use a paperclip to mark the destination. Usually I will select five or six card numbers at random and move them to the next destination on the card. Moving five or six will generally take about 15 to 20 minutes. For longer sessions I move more cars and/or invoke rules that complicate the session. Rules may include such requirements as servicing the engine, requiring the engine to move forward from one side to the other which means turning on turntable, and pulling all cars from one side to the other. Another process is to work each side with a seperate engine and move two trains rather than working both sides with one engine. Of course two operators can work simultaneously and coordinate the movement from one side to the other over the single connecting track.

Bob

Attachment: 20160511_095050_resized.jpg (Downloaded 134 times)



____________________
Bob
Back To Top


 Current time is 03:20 am
Page:  First Page Previous Page  ...  4  5  6  7  8  9  10  11  12  13  14  ...  Next Page Last Page  

Freerails > Model Railroad Forums > Large Scale > 'Geneseo Railway' - Gn15
Top



UltraBB 1.172 Copyright © 2007-2016 Data 1 Systems