View single post by W C Greene
 Posted: Tue Feb 17th, 2009 04:36 pm
PMQuoteReplyFull Topic
W C Greene



Joined: Fri May 4th, 2007
Location: Royse City, Texas USA
Posts: 8279
Status: 
Offline
James-the "slow crawl" order is in effect on the "high line" and the 10 foot pole makes things much easier to switch persnickity ore cars. When operating on my layout, a trip to the BG#2 is needed BEFORE operations can commence. This is the only known railroad that requires its' crews to hoist a few before work.   Woodie



____________________
It doesn't matter if you win or lose, its' how you rig the game.
Close Window